KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  9-22-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Condensation line.

Drilled a hole in the condenser outlet manifold for the condensation line and secured it with RTV. Finished wiring the LED for the ELT DIN connector. This is supposed to flash to verify that GPS data is being received by the ELT

Pics: IMG_1009 - IMG_1011.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.