KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  8-26-2018
Number of Hours:  2.75
Manual Reference:  
Brief Description:  Tailcone ground

Got the airframe ground put together and mounted in the tailcone. Put some dielectric grease on the bare aluminum to copper interface to hopefully prevent corrosion at that interface. This was tightened down a lot to create a gas-tight interface.

Pics: IMG_0989 - IMG_0982.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.