KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  7-23-2018
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Evaporater faceplate, A/C hoses

Installed the seals on the evaporater faceplate to prevent air leakage on both the inlet and outlets of the evaporater.

I also drilled the holes for the A/C hoses to pass through the tailcone bulkhead.

Pics: IMG_0954 - IMG_0956.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.