KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  6-6-2018
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Evaporater outlet

This entry covers the work done since 5/29. Multiple layups were put on the foam blocks to make the ducts. Once finished I sanded off the rough ends at the openings of the ducts, then dug out the foam to leave the final duct. These were cleaned up better than shown in the pictures.

Pics: IMG_0936 - IMG_0938.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.