KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  4-11-2018
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Condenser mount

Started working on the lower condenser mount. I felt like there should be a solid connection between the two heat exchangers so there will be an angle on each one connected by a bolt with an aluminum spacer to allow a strong clamping force without distorting the flanges on the heat exchangers.

Pic: IMG_0904.jpg
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.