KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  12-1-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Evaporater mount

More work on the evaporater reinforcement. I am adding a couple of heavy aluminum straps across the back of the evaporater to reinforce it. These will be attached with pulled rivets. I also am adding angles along the existing aluminum angles on the sides to produce a surface parallel to the sides of the evaporater.

Work done on 11/29 and 12/1.

Pics: IMG_0853 - IMG_0855.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.