KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  4-23-2017
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Tailcone wiring

Installed the insulation under the baggage floor, except for the aft-most 5 inches or so which will interfere with riveting the tailcone to the fuselage. Ran the conduit for the wiring and static plumbing under the baggage area and into the wing root area.

Pics: IMG_0726 - IMG_0729.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.