KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  8-25-2016
Number of Hours:  1.50
Manual Reference:  30-3-5:6
Brief Description:  Step intallation

Drilled the steps to the final size, but the left side especially had a bit of slop due to the inability to get everything lined up perfectly while drilling. I decided to drill the steps out to 1/4" and use an AN4 bolt instead. I needed to borrow Kerrys right angle pneumatic drill to be able to do this.

Steps were primed later on and are ready to install. This will be delayed as long as possible since they will be in the way when walking around the plane.

IMG_0588.jpg
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.