KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
' style=
Date:  8-14-2016
Number of Hours:  2.00
Manual Reference:  30-2-1:6
Brief Description:  Step installation

Worked on getting the support blocks for the step installed. Used some scrap wood to support the block while it was being drilled. It was a bit of a pain to reach this from the back of the fuselage but that was the best way to get to this using the right angle drill kit.

IMG_0581.jpg - IMG_0584.jpg
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.