KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  12-28-2007
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Started some fibreglassing of the tips

Continued fitting the tips to the elevators and rudder. Tried my hand at fibreglassing for the first time. See how it turns out in the morning. Set up the forward section so I can do some riveting on the forward top skin. Drilled out he hole for the rear strobe light. Think I am missing a wire or two. Will run a couple tomorrow to join up with the wing wiring.
' style=

VS tip with first layer of glass on

VS tip with first layer of glass on

' style=

Riveted the top of the rudeder tip

Riveted the top of the rudeder tip

' style=

Fitted and drilled the bottom fairing on the rudder

Fitted and drilled the bottom fairing on the rudder

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.