Fabricated the Flap Actuator rods. Fitted the control mechanisn for the airlerons and installed the bellcrank rods. Drilled holes in fuselage to allow Flap rods to pass through then adjusted flaps so they were up against the bottom of the fuselage. Lined up all trailing edge of both wings and secured lock nuts.
Control edges aligned
Control assembly inplace but not completed yet.
Flap actuator rod going through bottom of fuselage