Finished of rivetting the seat floors and installed the platenuts on each side of the centre tunnel. Rearranged the workshop and got out the wings. Set up a trolley to support the inboard section of the wing and slowly slid it into the 704 bulkhead. Bought some 7/16 bolts and tapered one down to line up the holes.