KitLog pro

Powered By Kitlog Pro v2.0

Rays Web Site
' style=
Date:  12-28-2007
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Assembled and drilled the Aft Fuselage section.

Got a fair amount of work done today. Got the J channels in place, cut to length and drilled. Set up my laser Level gizmo and checked the alignment of the Aft fuse assy. it is dead on! Drilled all the holes south of the 706 bulkhead that can be drilled. then proceded to dry assemble the Elevator Bellcrank assy.
' style=

Aft Fuselage wi J channels in Place

Aft Fuselage wi J channels in Place

' style=

Checking Aft Fuse Alignment w/Laser

Checking Aft Fuse Alignment w/Laser

' style=

Elevator Bellcrank assy

Elevator Bellcrank assy

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.