Powered By Kitlog Pro v2.0
Rays Web Site
RV-9A
Empennage
17 Logs Found
Date
Hours
Work Log Summary
Details
10-28-2004
6.0
Finish Elevators
10-27-2004
10.0
Fit Right Elevator to Horz Stab, assemble Left Ele
10-14-2004
7.0
Build trim Tab
09-06-2004
12.0
Building the Right elevator
08-17-2004
5.0
Complete Rudder Assembly
08-14-2004
9.0
Rudder assembly, Trailing edge riveting.
Details
08-13-2004
7.0
Rudder counterweight installation & riveting
08-11-2004
8.0
Rudder Assembly
08-11-2004
8.0
Finish Vert Stab assy.
Details
08-07-2004
8.0
Deburr, Dimple, Prime Vert Stab
08-06-2004
3.0
Drill Rib to Spar attach Holes
08-05-2004
9.0
Drilling Vert Stab
08-04-2004
7.0
Assemble Horizontal Stab
08-03-2004
8.0
Assemble Horizontal Stab
08-02-2004
7.0
Prep and prime Horizontal Stab Parts
07-30-2004
9.0
Prep, Match Drill, Dimple and assemble Horizontal
07-10-2004
9.0
Assemble the Horizontal Stabilizer Skeleton
SITE NAVIGATION
RV-9A Home
All
Empennage
Engine
Fuselage
Miscellaneous
Shop Supplies
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.