Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Final Assembly
11-11-2011
< Previous Log Entry
Next Log Entry >
Date:
11-11-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Set propeller pitch and tracking
Set propeller pitch and tracking as follows:
1. Checked with Rans tech support on suggestions for initial prop pitch. Rans suggested 15 degrees taken at the inboard stripe.
2. Applied masking tape to both blades to index protractor position. Clamped propeller protractor n place.
3. Checked back of propeller blade for level. Also, leveled vertical surface of propeller protractor.
4. Set both blades to 15.0 degrees.
5. Checked tracking using wheel ramp and small piece of wood.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.