Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Final Assembly
11-5-2011
< Previous Log Entry
Next Log Entry >
Date:
11-5-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Mounted wings to forward carry-through spar
Mounted wings to fuselage as follows:
1. Set up metal sawhorses and sorted wing attach hardware. Removed access covers on seat ramp skins.
2. Mounted RH wing first using taper pins to assist in spar bolt hole alignment, followed by wing attach bolts. Temporarily tightened bolts.
3. Mounte LH wing.
4. Torqued nuts on tje wing bolts to 175 in/lbs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.