KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  8-24-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installed oil door in top cowling

Installed oil door in top cowling as follows:

1. Laid out holes for new hinge assembly received from NonStop Aviation.

2. Drilled holes to #40, then #30. Enlarged holes in stationary half of hinge to accommodate #8 machine screws.

3. Prepped and primed aluminum parts.

4. Riveted fastener receptacles to frame. Riveted frame to top cowling. Riveted door to hinge using 4 Avex rivets. Filled the four 3/32 holes from the factory with 40APR1/8 rivets.

5. Attached door assembly to top cowling using stainless hardware, including high temp nuts. Southco fastener stud will wait on rubber washers on order.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.