KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  7-30-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Completed exhaust system installation

Completed exhaust system installation as follows:

1. Installed new aft couplings received from Rans.

2. Removed header pipes from cylinders and applied nickel high temp lubricant. Re-installed header pipes.

3. Drilled and riveted tail pipe clamp with CCPQ-44 rivet. Fitted, centered, and drilled tail pipe to muffler. Measured OD of CCPQ-44 rivet in the clamp and enlarged holes in the tail pipe and muffler to the same size. :Lubricated tail pipe, fitted to muffler, and clamped in place.

4. Fabricated and installed tail pipe hangar brackets.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.