KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-12-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Fuselage wiring 1

Began wiring of center fuselage as follows:

1. Installed Safety Trim contoller on back side of center inspection panel.

2. Fabricated wiring harness and ran wires through the center spar to connect to the control stick switches.

3. Installed ELT mounting bracket. Temporarily installed ELT and antenna.

4. Fabricated antenna cable and installed using cable tie saddles. Connected factory wiring harness and routed through center spar.

5. Cut a length of RG-400 cable for the aft VHF antenna. Fastened to belly using cable tie saddles. Routed forward through center spar.

6. Cut two lengths of RG-400 for the forward VHF antenna and transponder antenna. Fastened to belly using cable tie saddles. Left cable ties loose for pitch servo and beacon wiring, as well as the static tubing.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.