Tom's Rans S-19 Builders Log
S-19
Fuselage
7-17-2011
< Previous Log Entry
Next Log Entry >
Date:
7-17-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Exterior brake line installation
Installed exterior brake lines as follows:
1. Connected hose fittings to wheel cylinder and fuslelage firewall fitting.
2. Installed hose clamp to landing gear bracket.
3. Filled groove in landing gear with polyurethane adhesive and temporarily tied brake line and alllowed to set for at least 24 hours.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.