Tom's Rans S-19 Builders Log
S-19
Fuselage
6-26-2011
< Previous Log Entry
Next Log Entry >
Date:
6-26-2011
Number of Hours:
2.00
Manual Reference:
Brief Description:
Performed pitch bungee modification
Installed pitch bungee modification as follows:
1. Removed flap mechanism bracket and drilled for 3# eyebolt. Installed eyebolt, washers and nut. Reinstalled flap mechanism bracket.
2. Marked forward push-pull tube and installed metal tang and hose clamps.
3. Installed bungee and closed hooks iwth vice grip pliers.
4. Tested bungee testing for 8 lb pull resistance at the vertical stick positioin.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.