Tom's Rans S-19 Builders Log
' style=
Date:  5-30-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuselage - prep for final assembly

Began prep for final assembly as follows:

1. Countersunk rivet holes on top of forward longerons where the bulkhead gussets attach.

2. Riveted bulkhead gussets to forward longerons using standard aircraft rivets. These subassemblies will get powder coated as units rather than separate parts.

3. Deburred and scuffed the bottom skin for the forward fuselage section. Removed mnor corrosion on the inside surface that had developed under the plastic coating. Wiped down with acetone. With outside temps in the high 90's, priming will wait.