Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Fuselage
4-16-2011
< Previous Log Entry
Next Log Entry >
Date:
4-16-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Joining Forward & Center Fuselage 1
Begain joining the forward and center fuselage sections as follows:
1. Cleco'd bottom skin on forward fuselage. Enlarged center rib holes to #30.
2. Poisitioned forward section in place and cleco'd floor ribs to center spar.
3. Attached longerons to the center section with cleco's.
4. Fabricated two fixtures from aluminum angle to position firewall parallel to center spar, cleco'd and clamped in place.
5. Checked assemblies to be level and square with each other. Drilled longeron into steel firewall weldments and cleco'd in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.