Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
Fuselage
3-6-2011
< Previous Log Entry
Next Log Entry >
Date:
3-6-2011
Number of Hours:
1.50
Manual Reference:
Brief Description:
Continued work on LH tailcone side skin
Continued fitting of parts to the LH tailcone side skin as follows:
1. Clamped longeron to upper edged of side skin with cleco clamps.
2. Transfer drilled longeron to #40.
3. Cleco'd LH tailcone top skin to side skin. Transfer drilled holes to #30.
4. Removed top skin and set aside.
5. Trimmed longeron to proper length and to clear rear bulkhead.
6. Set LH side skin aside pending resolution of the corner stringer issue.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.