KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  10-3-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  RH wing - final assembly 2

Continued final assembly of RH wing with the upper aft skin and associated components as follows:

1. Prepped and primed the upper aft skin, skin stiffeners, and other associated parts.

2. Flipped RH wing assembly over to right side up.

3. Connected fuel line to tank and pressure tested wing fuel system. Capped off vent and fuel line to protect from debris and insects during storage.

4. Assembled aileron push-pull tube into leading edge.

5. Assembled scupper components and cleco'd in place. Riveted per Rans rivet schedule.

6. Sealed scupper to tank filler neck with Dow Corning 730 sealant.

7. Assembled fuel sender inspection hole ring to skin with AAPQ-41 rivets. Temporarily attached inspection cover with two #6 machine screws.

8. Riveted skin stiffeners in place using Avex rivets.

9. Installed molex connectors on wing root ends of wires for landing light, nav/strobe light, and fuel sender. Temporarily connected lights and performed end-to-end tests. Tested fuel sender with an ohmmeter.

10. Cleco'd upper aft skin in place for final assembly.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.