Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
All
11-26-2011
< Previous Log Entry
Next Log Entry >
Date:
11-26-2011
Number of Hours:
6.00
Manual Reference:
Brief Description:
Completed wiring, plumbing + more taxi tests
More final assembly tasks as follows:
1. Joined pitot and AOA tubes from RH wing to fuselage.
2. Dressed and laced wing root wiring both in the wing and fuselage sides.
3. Lubed rod ends inside wing and installed all wing inspection covers.
4. Filled tanks again, and recalibrated the Dynon fuel gauges. The unusable fuel is no longer indicated by the gauges.
5. Performede more taxi tests (slow speed). The Dynon still needs configuration work to correct oilt temp and CHT indications.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.