KitLog pro

Powered By Kitlog Pro v2.0

Tom's Rans S-19 Builders Log
' style=
Date:  11-26-2011
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Completed wiring, plumbing + more taxi tests

More final assembly tasks as follows:

1. Joined pitot and AOA tubes from RH wing to fuselage.

2. Dressed and laced wing root wiring both in the wing and fuselage sides.

3. Lubed rod ends inside wing and installed all wing inspection covers.

4. Filled tanks again, and recalibrated the Dynon fuel gauges. The unusable fuel is no longer indicated by the gauges.

5. Performede more taxi tests (slow speed). The Dynon still needs configuration work to correct oilt temp and CHT indications.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.