Powered By Kitlog Pro v2.0
Tom's Rans S-19 Builders Log
S-19
All
6-25-2010
< Previous Log Entry
Next Log Entry >
Date:
6-25-2010
Number of Hours:
2.50
Manual Reference:
Brief Description:
Completed initial assembly of RH flap frame
Completed drilling and initial assembly of RH flap frame as follows:
1. Assembled ribs and other parts to spar using 3/32 clecos.
2. Drilled lower rib holes to spar to 3/32.
3. Enlarged all rivet holes to 1/8.
4. Enlarged corner holes on #1 rib and reinforcement plate to 3/16.
5. Marked parts and disassembled for deburring, edge polishing, buffing, and priming.
Almost done
Root detail
Forward corner holes drilled to 3/16
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
191
842
Ailerons
6
27
Avionics
3
6
Electrical System
2
26
Empennage
1
3
Engine
19
90
Final Assembly
24
118
Flaps
9
22
Fuel System
2
3
Fuselage
79
368
Interior
2
4
Landing Lights
3
17
Miscellaneous
1
5
Parts
1
2
Project
2
Vertical Stabilizer
3
3
Wings
34
148
Copyright © 2001-2024 Matronics. All Rights Reserved.