KitLog pro

Powered By Kitlog Pro v2.0

N2C...CruZer
' style=
Date:  11-18-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Hinges, riveting

Continued installing hinge on the trim tab. After this was complete I riveted the front of the elevator where each rib attaches.

I then installed the center channel (riveted to ribs 3 and 4) and also the north/south extrusion with the tab that gets riveted to the front of the elevator and then I installed the elevator onto the H-Stab. The trailing edges lined up...Halleluljah!!!

I then proceeded to drill the skin to ribs 4,5 and 6, which I had gotten from Zenith undrilled. I clecoed each hole to hold the shape and then riveted each rib as I finished it.

Check the plans...five AS5 stainless steel rivets get installed on the center channel strap.
' style=

Center channel and north/south extrusion

Center channel and north/south extrusion

' style=

% AS5 Stainless rivets on the center channel strap

% AS5 Stainless rivets on the center channel strap

' style=

Trim Tab Hinge

Trim Tab Hinge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.