Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Empennage
6-3-2015
< Previous Log Entry
Next Log Entry >
Date:
6-3-2015
Number of Hours:
1.00
Manual Reference:
Brief Description:
Horizontal stabilizer
Buffed the starboard elevator skins ready to paint.
Placed skins on the horizontal stabilser and clecoed into place. Need to determine which is the top of the stabliser. Aso need ot verify 1/8" rivets in the leading edge.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.