Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Empennage
5-30-2015
< Previous Log Entry
Next Log Entry >
Date:
5-30-2015
Number of Hours:
4.00
Manual Reference:
Brief Description:
Starboard elevator
Match drilled all 1/8" holes in starboard elevator. De-burred and dimpled all holes and left to soak in kerosene.
Dimpled and countersunk all rivet holes in the elevator frame.
Bracket of trim tab
Slot for trim tab
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.