KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
' style=
Date:  2-14-2013
Number of Hours:  2.00
Manual Reference:  R Aux Tank
Brief Description:  Match-drilling R Auxillary Tank

Tonight, I continued match-drilling the right auxillary tank. Specifically the baffle. I started by removing the "normal ribs" and clecoing the baffle to the remaining tank rib flanges to hold it in place, Then I began match-drilling the holes from the inside out, just like I did the ribs.
' style=

Baffle clecoed in place.

Baffle clecoed in place.

' style=

Z-brackets are also in place to be match-drilled to the baffle.

Z-brackets are also in place to be match-drilled to the baffle.

' style=

Tape helps to hold the skin tightly against the baffle flange for match-drilling.

Tape helps to hold the skin tightly against the baffle flange for match-drilling.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.