Brief Description: Match-drilling R Auxillary Tank
Tonight, I continued match-drilling the right auxillary tank. Specifically the baffle. I started by removing the "normal ribs" and clecoing the baffle to the remaining tank rib flanges to hold it in place, Then I began match-drilling the holes from the inside out, just like I did the ribs.
Baffle clecoed in place.
Z-brackets are also in place to be match-drilled to the baffle.
Tape helps to hold the skin tightly against the baffle flange for match-drilling.