KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
' style=
Date:  11-20-2011
Number of Hours:  3.00
Manual Reference:  E Section 9(6-7)
Brief Description:  Match-drilling the Right Elevator

Tonight I disassembled the left elevator and re-assembled the right elevator for match-drilling. Then I match-drilled the bottom skin. Next, I'll finish with the top skin side.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.