My replacement rivets came in the mail recently, so I was going to go back to working on the horizontal stabilizer (riveting it together), but then I realized that almost all my clecoes were being used to hold the elevators together for match-drilling. Oh well, I might as well finish work on the elevator prep. Then I'll be able to rivet all pieces together, one after another. I started by trimming the trailing edge AEX wedge to fit and then match-drilled the elevator skins on both sides of the left elevator.
Love those pneumatic tools.
Left elevator, all match-drilled and ready to disassemble, debur and dimple.