- Finished riveting the turtle deck, except formers #1 as noted last night.
- Installed the screws at the upper angles where they protrude inside the box beam. Those were tough to get in, I used a socket wrench to hold the nut in place against the screw. The socket itself was too deep for the screw to reach, so I put 2 nuts in the socket. The bottom one gave enough thickness to let the upper one reach the screw threads. Once the nut was on with enough threads I removed the extra nut and kept tightening.
- Did some minor clean/prep work on some parts to be painted.