Brief Description: Flap construction cont. (R. side)
Installed the nose and top skins. Weighted it down to the table and installed the trailing edge "Wedge" using the wedge from the L. side flap as a spacer. Drilled and cleco'd the trailing edge to the table. Match drilled all holes. Ready to disasseble and prep for priming.