Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-9A
All
9-23-2021
< Previous Log Entry
Next Log Entry >
Date:
9-23-2021
Number of Hours:
4.50
Manual Reference:
Brief Description:
Fuselage (Center Section)
Time to begine construction of the "Center section"of the Fuselage. Began by modifying the center (4) ribs. Two of the ribs have a removable piece for installing the "control stick assembly".
Next, installed "nutplate" on all F-916 ribs as required.
Modified F-916 rib
Nut plates installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
286
1243
Avionics
1
4
Empennage
71
282
Engine
1
1
Fuel Tank Assembly
18
96
Fuselage
77
363
Service Bulletins
2
2
Tech Support
1
1
Tools
7
32
Wings
108
462
Copyright © 2001-2024 Matronics. All Rights Reserved.