KitLog pro

Powered By Kitlog Pro v2.0

MICHAEL'S WEB SITE
' style=
Date:  9-23-2021
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Fuselage (Center Section)

Time to begine construction of the "Center section"of the Fuselage. Began by modifying the center (4) ribs. Two of the ribs have a removable piece for installing the "control stick assembly".
Next, installed "nutplate" on all F-916 ribs as required.
' style=

Modified F-916 rib

Modified F-916 rib

' style=




' style=

Nut plates installed

Nut plates installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.