Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
RV-9A
All
3-24-2021
< Previous Log Entry
Next Log Entry >
Date:
3-24-2021
Number of Hours:
3.00
Manual Reference:
Brief Description:
Control rod construction
Cut the control rods to lenght as per plans. De-burred and primered. I used corks to plug the tubes and poured some primer inside. Then rolled them around to coat the inside fully. Drilled and riveted the threaded ends in place.
Aileron control rods
Plugged ends to primer inside.
Threaded ends installed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
286
1243
Avionics
1
4
Empennage
71
282
Engine
1
1
Fuel Tank Assembly
18
96
Fuselage
77
363
Service Bulletins
2
2
Tech Support
1
1
Tools
7
32
Wings
108
462
Copyright © 2001-2024 Matronics. All Rights Reserved.