Brief Description: Flap construction cont. (R. side)
Began construction of the R. side Flap Assembled Nose ribs and hinges. Fabricated the FL-906-A (Angle) And FL-906-C (spacer) Assembled and match drilled.
Drilled the table to lower skin and inlarged holes to 5/8" for the cleco's. Then assembled the skin, ribs, and spar onto the table.