KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  11-22-2014
Number of Hours:  6.00
Manual Reference:  49-03, 49-11
Brief Description:  Work on Cooling System

49-03: Countersunk the holes in the F-1205B Bracket. Riveted the bracket and the F-1206B Hinge to the Cooler Box Door. Started to match-drill #30 holes into the F-1206A Hinge but I was messing up (enlarging) the holes in the F-1204A Cooler Box Face. I will do this step when I go to the hanger and use the drill press.

49-11: Deburred again the FF-1212 Oil Cooler Frame, FF-1213 Oil Cooler Frame Bottom and the FF-1214 Oil Cooler Faceplate. Countersunked the #40 hole in the Faceplate. Dimpled the #40 holes in the F-1215 Oil Cooler Spacer and the Oil Cooler Frame.

Primed the F-1285 Cowl Bottom Close-Out, the Cowl Oil Door harware, the aluminum hardware for the Cooler Box and another S-1210 prop spacer.
' style=

Hinge riveted to Cooler Door

Hinge riveted to Cooler Door

' style=

Bracket riveted to Cooler Door

Bracket riveted to Cooler Door

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.