KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  11-2-2014
Number of Hours:  3.00
Manual Reference:  38-06
Brief Description:  Cowling work

Did more sanding of the edges of the Top and Bottom Cowls to have a gap between the edges for paint in the future. Drilled holes into the Bottowm Cowl and F-12116 Mid Cowl Hinges and F-12117 Lower Cowl Hinges. Removed the hinges and deburred the holes.
' style=

Drilled holes in Rt Bottom Cowl

Drilled holes in Rt Bottom Cowl

' style=

Drilled holes in Lt Bottom Cowl

Drilled holes in Lt Bottom Cowl

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.