Brief Description: Installed battery and other electrical parts
Deburred the F-1201S Battery Channel. Installed the the F-1257B Anti-Chafe Strips and placed the battery over the strips. Temporarily bolted the battery channel over the battery. Will prime this piece before final installation. Bolted the 992-819 Starter Relay and 965 347 Rectifier Regulator to the fuselage. Installed the battery cables per the plans but will complete this later.