KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  4-8-2018
Number of Hours:  3.00
Manual Reference:  36A
Brief Description:  Work on main wheel fairings

Removed the main wheel fairings from the brackets. Final drilled #19 the holes for the brackets. Final-drilled #27 3 holes in the left wheel fairing and riveted 3 nutplates at the hole locations. Put together the two left wheel fairings and final-drilled #27 the remaining holes. Drilled nutplate rivet attach holes in the U-00001B Aft Fairing and countersunk them. Riveted nutplates on the #27 holes.
' style=

Nutplates on Aft Fairing

Nutplates on Aft Fairing

' style=

Epoxy flox mixture on inside

Epoxy flox mixture on inside

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.