KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-1-2018
Number of Hours:  1.00
Manual Reference:  36A
Brief Description:  Nose leg fairing

Placed the U-00007 Nose Leg Fairing on the nose leg assembly. Centered the fairing on the nose leg and clamped in place. Drilled three #40 holes in the bottom of the fairing. Drilled holes in the fairing and nose gear leg assembly. Final-drilled 2 holes to #19 and tapped to 8-32.
' style=

Nose leg fairing

Nose leg fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.