KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  9-7-2016
Number of Hours:  1.50
Manual Reference:  35, Matco Manual
Brief Description:  Worked on left wheel assemby and brake.

35-02, 35-04 and Matco Manual: Removed the left wheel so I could access the nuts outboard of the brake plate. Tightened 2 of the AN4-16A attaching the Brake Plate and Axle to the left Main Gear Leg. Torqued the nuts to 100 in-lbs. Greased the bearings with Aeroshell 22 and installed the left wheel and the brake shoe. Place a new cotter pin to secure the axle nut.
' style=

Left wheel removed

Left wheel removed

' style=

Left wheel and brake installed

Left wheel and brake installed

' style=

Left axle safetied

Left axle safetied

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.