KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  7-11-2015
Number of Hours:  4.00
Manual Reference:  37-08. 06-07, 33-0
Brief Description:  Fuel Tank Vent Modification, checked Emp. bolts

Went back to the steps I had skipped and need to finish.

37-08: Fabricated the Fuel Vent Air Line by cutting 3 different sizes of plastic tubing and connecting them to the FLF-0006 (plastic T). Fabricated the T-01219B and T-01219C Fuel Vent Lines. Primed the F-1296 Vent Bracket and then riveted it to the F-1207C-R Bulkhead. Installed an Adel clamp to the bracket and snap bushings in the holes in the bulkhead and F-1282-R Skin. Will finalize this page after the TC is riveted to the Fuselage.

06-07: Rechecked the AN3 bolts on the V-Stab and those attaching the hinge hardward. Tightened those that were not tight and torqued all of the bolts to 25 in-lb. Did the same to the H-Stab bolts. Applied torque seal on the bolts.

33-04: Cut 2 inch X 3 inch anti-slip material and applied on the steps.
' style=

Fuel vent line T connector

Fuel vent line T connector

' style=

Aft fuel vent line

Aft fuel vent line

' style=

Fwd fuel vent line

Fwd fuel vent line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.