KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  6-14-2015
Number of Hours:  5.00
Manual Reference:  32-11
Brief Description:  Work on flight controls, rudder

Prepping for attaching the Tailcone to the Fuselage I went back to Section 32, Flight Controls. Made the Rudder Pedal Rigging Stop. Routed the rudder cables thru the F-1207B Baggage Bulkhead all the way to the F-1202F Bulkhead on the front. I noticed that I had routed the ADS-B cable through the rudder cable opening on the left. I had to unscrew the system blocks, the F-1262 Flap Handle Block and the cushioned clamp at the fuel pump to be able to reposition the ADS-B cable. It took almost an entire day to correct the error I had made. I did try to pull the cable from the Panel Base but it was more work to disconnect the rudder pedals.

Sanded the right edge of the slot for the nose gear leg in the Cowl Bottom some more because it still appeared too close the gear leg.
' style=

Rudder Pedal Rigging Stop

Rudder Pedal Rigging Stop

' style=

Rudder cables in Tunnel

Rudder cables in Tunnel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.