Powered By Kitlog Pro v2.0
My RV-12 Build Log
RV-12
Finishing
8-18-2013
< Previous Log Entry
Next Log Entry >
Date:
8-18-2013
Number of Hours:
2.00
Manual Reference:
34-02 & -09
Brief Description:
Canopy work
34-02 – Drilled #19 holes into the C-1212 Guide Blocks, countersunk the holes and radiused the edges.
34-09 – Drilled holes into the C-1210 Canopy Lift Handles. Primed and painted the inside of the Canopy Skirts and C-1206 Guide Plates.
34-07 – Radiused the edges of the C-656 Canopy Handle. It’ll need more work to look nicer.
CSK & radiused Guide Blocks
Lift Handles with drilled holes
Painted Canopy Skirts
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
899
2532
Avionics
38
109
Empennage
93
236
Engine
25
88
Finishing
288
838
Firewall Forward
54
189
Fuselage
156
372
Inspection
5
18
Miscellaneous
26
90
Modifications
38
96
None
54
189
Pre-Flight Checks
7
11
Prop
2
9
Shop Supplies
3
8
Tools
1
3
Wings
109
276
Copyright © 2001-2024 Matronics. All Rights Reserved.