KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  1-1-2013
Number of Hours:  4.00
Manual Reference:  SB-12-11-09
Brief Description:  Landing Gear modification

Continuing with work on the Landing Gear Service Bulletin. Removed the 2 outboard most cushion clamps that attach the F-1204Y Wire Run Conduit to the Center Section Assembly. Using a step drill, drilled 3/8 holes in the F-1276 Bottom skin. Match drilled holes from the bottom through the Center Section Assembly. Also match-drilled holes through the F-1270A and F1270D Side Skin Doublers into the left side of the Fuselage. This SB work is taking a lot of time. It was slow drilling through side skin even with brand-new drill bits.
' style=

3/8 holes bottom of Fuselage

3/8 holes bottom of Fuselage

' style=

Drilling through Center Section

Drilling through Center Section

' style=

Side Skin Doublers on left

Side Skin Doublers on left

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.