Section 31-08: Installed the OAT Probe and routed the harnesss/wires through the seat ribs, the tunnel and all the way back to the rear of the fuselage.
Section 42D-13: Finished connecting the static lines to the F Plastic Tee. Did not connect the F-00012 line to the left static port yet. I'm still trying to decide if I'll change the static ports to standard ones.
Section 42C-19: Secured the SV-ADAHRS-200 to the brackets. connected the AFT Pitot Line and Static Line to the ADAHRS. I have not connected the Tailcone to the Fuselage yet, therefore, can't connect the wires and tubes between the TC and Fuse at this time.