KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
' style=
Date:  10-28-2012
Number of Hours:  4.50
Manual Reference:  42C-15, 32-08
Brief Description:  Installed ELT and put spacers to Flaperon Torque T

Section 11-09: Wrapped friction tape aroun the WH-P30 because I forgot to put heat shrink tubing before connecting the Molex pins to the plug. I tried a large heat shrink tube but it did not shrink enough to wrap tightly around the wires. Tested the Trim/Servo Assembly again and it works well. Connected the WH-P30 to the plug in the servo tray and secured with tie wraps.

Section 42C-15: Installed the ELT Antenna to the the ELT Bracket and secured the latter to the F-1205A Mid Fuse Brace. Crimped butt splices to the wires coming from the 452-6505 Buzzer and connected a ground wire and ring terminal to the black wire. Match-drilled holes into the F-1204H Bulkhead Cap. Final-drilled #19 one hole for the ground wire. Riveted the ELT Mount Tray to the Fuselage. Will connect the other wires later.

Section 32-08: Cut the F-1261 Spacer into 4 pieces. Match-drilled #30 holes into the spacers and final-drilled #12 holes in the spacers. Scuffed the mating surfaces of the spacers and Flaperon Torque Tubes and applied epoxy. Riveted the spacers to the tubes.

Primed and painted the F-1230 Tunnel Cover and the F-1214 Step Floor Cover.
' style=

ELT and antenna

ELT and antenna

' style=

Flaperon Torque Tubes

Flaperon Torque Tubes

' style=

Painted parts

Painted parts

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.